Position: PFE role (TT90SF RM 4150)
Domain: Exterior & BIW
JOB PURPOSE
To achieve the Quality, Cost and Delivery Targets for the Project
To manage the operations of development, validation and industrialisation of the
components of his scope in compliance with Renault / Nissan Design System and the technical regulation requirements
To manage the convergence of the carry-over/carry across rate after the Pre-Contract
EDUCATIONAL QUALIFICATIONS
BE or Master in Mechanical / Plastic Engineering with Automobile knowledge
RELEVANT EXPERIENCE
6+ years of experience with a technical background in particular commodity in Interior / exterior trims parts / Body / Seats / Platform components development.
MAJOR RESPONSIBILITIES
- Monitoring the Function Group:
- Makes the part-to-part or equipment-to-equipment schedule
- Monitors the GF activities (schedules the meetings, GF deliverables of which the monthly instrument panel…)
- Defines, frames and contributes to the decision of technical solutions created and validated with the Development team, allowing to accomplish the QCDP objectives
- Creates the QCDP and considers the results and GF forecasts (for the serial life monitoring of the eco plan) with respect to the schedules.
- Monitors the achievement of the milestone results
- Creates and monitors the necessary task-forces
Monitoring the development operations:
- Indicates and deploys the QCDP objectives in view of the design and request for bid and allocation of the suppliers
- Monitors the entries/exits between the Development team and Design, and monitors the Design feasibility with the Development team
- He/she is responsible for the representativeness for the parts digitisations in compliance with the project milestones
- Assists in creating the typical packaging sections, input data for the DMDR and producing digitisations
- Manages the execution of documentary deliverables & makes specify the BOM managed in SIGNE/G2B
- Based on the Development team does the technical documentation and CAPRO RO process(Renault):
o CAPRO: Co-signed by the Metier team and PFE
o RO: Prepared by the PFE and presented to the signatories by the PFE
o Files for change: Signed by the PFE and/or Metier Team - He/she is responsible for adherence to the document milestone for his/her scope
- He/she is the only leader to whom the LUP/Q-Base questions of his/her scope are allocated. He/she reports their processing progress. Ensures in resolving the questions and monitors its application to the vehicle
- He/she is in charge of the quality of his/her development:
o Ensures the scheduling of ANPQP expectations and specifies the expectations for intermediate milestones
o Coordinates and monitors the development based on the ANPQP procedure, ensures the documentation of SI ANPQP by different GF participants
o Monitors the relation with the supplier by links with the Purchase Department: - Ensures that the RNTBCI input data is provided to the supplier
- Contractualize the development schedule, production schedule (PSW) with the supplier
- Ensures the convergence of the expectations for PSW
- Ensures that the suppliers results of the POEs (purchased-out part) in his scope are obtained based on the Development team. In the case of him validating the results, documenting the database of the ANPQP monitoring
- Ensures that the RNTBCI participants validate the supplier results following the defined Who does What
- Assists in signing the CRAPP so the SQF (Supplier Quality Department) signs the PSW (Part Submission Warrant)
- Ensures compliance of technical standards by the supplier based on the Development team
- Defines and ensures the proper representative level of the prototypes and the IOD (definitive off-tool part) with respect to the project milestone
- The project PFE/Shatan & serial life mass production share out the carry-back & carry-over developments
Monitoring the validation operations:
- Defines the generic validation plan for the project
- Monitors the progress of the validation plan in REVS/CADICS
- Reports about regulatory requirement integration level
- Ensures, with Quality cells of his metier, the Safety Experts and Validation Synthesis Leader:
o The identification of safety risks in his scope
o The creation of risk clearance associated plan by Development team
o The production and validation of design file by the Development team - Manages the risk clearance plan with the Validation Synthesis Leader/Fit & Finish
Monitoring the industrialisation operations:
- Ensures the start-up responsibility (link with Startup Function Group, AVES (Alliance Vehicle Evaluation System) convergence) and to make it compliant with his scope
- During serial life mass production: Monitors in detail the application of modifications with the Product
Industrialisation Leaders/PE with respect to the programming the chain of modification after the validation done by Comodif/CVE
***************************************************************************************************************
Apply for this position
Mention correct information below. Mention skills aligned with the job description you are applying for. This would help us process your application seamlessly.
